A 3-span prestressed concrete bridge replacing a flood-damaged crossing.
Hydrological study, design and construction of a 96 m three-span prestressed girder bridge. Deep bored piles were taken past the scour zone, and the deck was widened to carry two traffic lanes plus protected walkways.
Comments & reviews
What people say.
No comments yet. Be the first to share your thoughts on this building.